2 MWpGroundUnity Foods
Karachi, Pakistan · 2025| Sector | Food and beverage |
|---|---|
| Modules | 3,650 × 545 W |
| Output | ≈ 2.9 GWh a year |
| Result | Cuts grid and diesel use |
Six operating plants, from 103 kWp to 2 MWp, all connected to online monitoring. Figures come from the project documentation.
2 MWpGround| Sector | Food and beverage |
|---|---|
| Modules | 3,650 × 545 W |
| Output | ≈ 2.9 GWh a year |
| Result | Cuts grid and diesel use |
1 MWpRooftop| Sector | Retail |
|---|---|
| Modules | 1,706 modules |
| Output | > 1.6 GWh a year |
| Result | Payback about 12 months* |
800 kWpRooftop| Sector | Industrial |
|---|---|
| Modules | 1,380 × 580 W |
| Output | ≈ 1.3 GWh a year |
| Result | Up to 55% of site consumption |
800 kWpGround| Sector | Hotels and resorts |
|---|---|
| Modules | 1,368 × 585 W |
| Output | ≈ 1.3 GWh a year |
| Result | Fixed-tilt, next to the hotel |
370 kWpRooftop| Sector | Textile manufacturing |
|---|---|
| Modules | 596 × 615 Wp |
| Output | > 535 MWh a year |
| Result | About 40% of the mill’s load |
103 kWpCarport + storage| Sector | Hotels and resorts |
|---|---|
| Battery | 147 kWh |
| Output | > 142 MWh a year |
| Result | Up to 65% of consumption |
* Dayizenza Mall pays back in about 12 months, including South Africa’s Section 12B tax incentive.
We arrange a reference call after the site audit. Tell us your sector and we match you with a comparable plant.